For evaluation and specialized consultation on solar power plant installation, contact us.

Our fields of activity

Energy storage systems

BESS

Rooftop solar power plants

Industrial kilowatt-scale (from 100 kW)
Residential kilowatt-scale (up to 20 kW)

Solar farms

Megawatt-scale (from 1 MW)

Frequently Asked Questions (FAQ)

The process begins with an initial assessment, which includes a site visit, technical and economic evaluations, and solar radiation analysis. After that, the Maxan team provides a customized solution tailored to your project's conditions.

The installation time varies depending on the complexity and size of the project. For rooftop solar power plants of 100 kW and above, it usually takes between 2 to 4 months, while for ground-mounted power plants of 1 MW and above, it typically takes between 4 to 8 months. This includes the stages of obtaining permits, design, and full project implementation.

Maxan uses high-quality solar panels, advanced inverters, and durable structures. All equipment is selected according to international standards, ensuring the highest efficiency and long lifespan to deliver maximum performance.

Solar power plants are supported by facilities such as power purchase agreements, tax exemptions, and low-interest loans. Maxan helps you take advantage of these facilities and manage the related processes in the best possible way.

The return on investment depends on factors such as location, electricity production, and electricity prices. In general, large solar power plants can recover the initial investment within 2.5 to 4 years and generate significant profitability thereafter.

Maintenance of the power plant includes periodic inspections of the panels, electrical systems, and equipment performance. Maintenance costs are generally low, and Maxan offers suitable maintenance packages to ensure your plant operates at optimal efficiency throughout its lifespan.